These are pictures taken from the front of the church, showing courtyard changes. These were taken August 2, 2001.
| This was taken from the front of the church, looking into what was once the courtyard. That cinderblock wall is temporary until phase two is completed. |
| Looking straight into the educational wing. Those windows and doors on lower level provides egress for the lowest level. |
| A corner shot. Those little windows are new and go from the social hall to the cinderblock wall -- until phase two is completed. |
| The opposite corner of the courtyard. That wall at the lower level is what was there. |
| This is our new parking lot looking from Indian Springs. The lower portion of that retaining wall shows the level of the parking lot. A fence will be built above the wall, preventing someone from falling into the lot. Landscaping will also be provided. |
| This is looking from Indian Springs onto the foundation of the new entrance addition. |
| This is looking straight into the excavated portion of the new addition. Somewhere in there is the excavation of the elevator. There have been problems with spring water erupting in various places. That's what we got for our predecessors locating in Silver Spring. |
| This is looking from the old Brewster Ave. entrance straight into the retaining wall. |
| The wall from close up. |